Case Studies


Our AIS EURELO case studies will give you an insight into the work we do and the customers we’ve helped.

Stolle Machinery

We recently completed a three-month project for Stolle Machinery with OEM, Goss International, to remove three large web offset printing presses from the ex Polestar Print facility in Sheffield.

Our scope of works included:

  • Full project management and CDM management
  • Electrical and mechanical services
  • Installation of over 20km of process pipework
  • Rigging and lifting of machinery, equipment and transport
  • Installation of a mezzanine floor and platforms at a weight of approximately 250 tonnes

Goss-International

Goss International

We recently completed a successful 12-month, £4.5m ‘Turnkey Installation’ of a canning plant for leading food and beverage can makers, Stolle, in Germany.

One printing press was destined for a new facility in Yorkshire, while the remaining two were to be reinstalled elsewhere in Europe.

To facilitate this our activities included:

  • Meticulously planning for lifting three presses with a combined weight of more than 1350 tonnes
  • Technical meetings and risk assessments to aid planning and ensure safety
  • Lifting of each section of the presses from its plinth using jacking systems
  • Skating of each section to the building’s exit
  • Lifting of each press onto its transportation, ready for the next stage of the journey
  • Deployment of two Forklift Trucks, a Valla Mini Crane, an Ormig Mini Crane, 60/80 Versa Lift and Machine Moving Skates
  • Use of a 220te mobile crane to complete some of the final lifts onto the low loaders
  • Careful movement of the dryer section of each press, which measured over sixteen metres long and four metres wide and weighed forty-three tonnes. Due to a decline on the road at the exit of the building the dryer could only be skated less than a metre at a time before it need to be raised on chocs to enable it to stay parallel, ready for the final lift and rotation onto the back of the low loader
Ford-Logo

Ford

We were commissioned as the principal CDM contractor of a ten month, £4.2m project for the removal of 83 heavy blanking and forming presses for export to China.

Our scope of works included:

  • Removal of all tool room machinery
  • Full isolation and lock off procedure
  • Site wide safety that exceeded ‘Ford’ standards
  • Dismantling and removal of 83 presses
  • Removal of all assembly cells including all robots and tooling
  • Site-wide handling of all dismantled equipment for packing and shipping
  • Full project management with more than 80 operatives on site at its peak
  • Deployment of 450T Hydraulic Gantry, 400T Hydraulic Gantry, Versa Lift and a Container Reach Stacker

GR-Engineering-Services

GR Engineering Services

Following on from the canning plant installation, we were contracted with the complete installation of a £4.6m tungsten and tin processing plant in Plymouth.

Our scope of works included:

  • Full project management and CDM management
  • Erection of building steelwork and cladding
  • Receipt, handling and installation of all processing plant
  • Rigging and lifting containment
  • Installation of electrical containment
  • Installation of steel, plastic and stainless pipework from 12mm to 900mm diameter
  • Pre-Fabricated and site run pipework