Ford Automotive: A £4.2m Project for the Removal of 83 Presses for Export to China

We were commissioned as the principal CDM contractor of a ten month, £4.2m project for the removal of 83 heavy blanking and forming presses for export to China.

Our scope of works included:

  • Removal of all tool room machinery
  • Full isolation and lock off procedure
  • Removal of all assembly cells including all robots and tooling
  • Site-wide handling of all dismantled equipment for packing and shipping
  • Site wide safety that exceeded ‘Ford’ standards
  • Dismantling and removal of 83 presses
  • Full project management with more than 80 operatives on site at its peak
  • Deployment of 450T Hydraulic Gantry, 400T Hydraulic Gantry, Versa Lift and a Container Reach Stacker